ITAC Assessment: LS2305
ITAC logo
ITAC Assessment: LS2305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Metal Foundry
NAICS 333511: Industrial Mold Manufacturing
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 479,160
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 2,260
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $251,581 2,600,500
kWh
Electricity Demand $105,871 24,091
kW-mo/yr
Natural Gas $105,894 10,956
MMBtu
TOTAL YEARLY COSTS $463,346
RECOMMENDED SAVINGS* $11,766 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,766

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $808 $90 $808
8,325
kWh
-
02 2.4133: Use most efficient type of electric motors $8,419 $7,350 $8,419
86,789
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $752 $900 $752
7,756
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,787 $2,315 $1,440
14,848
kWh
$347
-
kW-mo/yr
TOTAL RECOMMENDED $11,766 $10,655 $11,419
117,718
kWh
$347
-
kW-mo/yr
TOTAL IMPLEMENTED $11,766 $10,655 $11,419
117,718
kWh
$347
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs