Assessment Year | 1997 |
---|---|
Principal Product | 24 feet and 28 feet wide double section prefabricated homes |
NAICS |
n/a
|
SIC | 2451: Mobile Homes |
Sales Range | $10 M to 50M |
# of Employees | 147 |
Plant Area |
72,000
ft2
|
Annual Production | 1,200
pieces
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $26,730 | 505,276 |
kWh
|
$0.053 |
Electricity Demand | $9,807 | 1,648 |
kW-mo/yr
|
$5.95 |
Electricity Fees | $420 | - |
|
- |
Natural Gas | $24,409 | 3,331 |
MMBtu
|
$7.33 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $81,675 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $45,265 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.421: Modify current incentive program | $35,750 | $10,000 | - | - | - | - | $60,750 | $(-25,000.0) | |
02 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $24,190 | $41,800 |
$(-560.0)
(-18,757)
kWh
|
- | - |
$27,000
-
lb
|
$(-2,250.0) | - | |
03 | 2.7231: Use radiant heater for spot heating | $16,200 | $9,300 | - | - |
$16,200
-
MMBtu
|
- | - | - | |
04 | 3.6192: Use a less expensive method of waste removal | $4,875 | - | - | - | - |
$4,875
-
lb
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $340 | $340 |
$115
3,810
kWh
|
$225
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7261: Install timers and/or thermostats | $320 | $580 |
$320
10,551
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $81,675 | $62,020 |
$(-125.0)
(-4,396)
kWh
|
$225
-
kW-mo/yr
|
$16,200
-
MMBtu
|
$31,875
-
lb
|
$58,500 | $(-25,000.0) | ||
TOTAL IMPLEMENTED | $45,265 | $51,100 |
$(-560.0)
(-18,757)
kWh
|
- |
$16,200
-
MMBtu
|
$31,875
-
lb
|
$(-2,250.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs