ITAC Assessment: TN0614
ITAC logo
ITAC Assessment: TN0614
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product 24 feet and 28 feet wide double section prefabricated homes
NAICS
n/a
SIC 2451: Mobile Homes
Sales Range $10
M
to 50
M
# of Employees 147
Plant Area 72,000
ft2
Annual Production 1,200
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,730 505,276
kWh
Electricity Demand $9,807 1,648
kW-mo/yr
Electricity Fees $420 -
Natural Gas $24,409 3,331
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,675 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,265

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 4.421: Modify current incentive program $35,750 $10,000 - - - - $60,750 $(-25,000.0)
02 3.6193: Install equipment (eg compactor) to reduce disposal costs $24,190 $41,800 $(-560.0)
(-18,757)
kWh
- - $27,000
-
lb
$(-2,250.0) -
03 2.7231: Use radiant heater for spot heating $16,200 $9,300 - - $16,200
-
MMBtu
- - -
04 3.6192: Use a less expensive method of waste removal $4,875 - - - - $4,875
-
lb
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $340 $340 $115
3,810
kWh
$225
-
kW-mo/yr
- - - -
06 2.7261: Install timers and/or thermostats $320 $580 $320
10,551
kWh
- - - - -
TOTAL RECOMMENDED $81,675 $62,020 $(-125.0)
(-4,396)
kWh
$225
-
kW-mo/yr
$16,200
-
MMBtu
$31,875
-
lb
$58,500 $(-25,000.0)
TOTAL IMPLEMENTED $45,265 $51,100 $(-560.0)
(-18,757)
kWh
- $16,200
-
MMBtu
$31,875
-
lb
$(-2,250.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs