ITAC Assessment: LT0081
ITAC logo
ITAC Assessment: LT0081
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product ANIMAL FEED
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area
n/a
Annual Production 120,000
ton
Production Hrs. Annual 3,876
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,119 3,625,147
kWh
Natural Gas $46,472 11,272
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,060 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,390

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,670 - - $2,270
-
MMBtu
$(-600.0)
02 2.2136: Install / repair insulation on steam lines $282 $48 - $282
-
MMBtu
-
03 2.2135: Repair and eliminate steam leaks $13,300 $130 - $13,300
-
MMBtu
-
04 2.4133: Use most efficient type of electric motors $1,316 $1,534 $1,316
23,740
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,081 - $1,081
19,343
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $140 $61 $140
2,638
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $271 - $271
4,689
kWh
- -
TOTAL RECOMMENDED $18,060 $1,773 $2,808
50,410
kWh
$15,852
-
MMBtu
$(-600.0)
TOTAL IMPLEMENTED $16,390 $1,773 $2,808
50,410
kWh
$13,582
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs