| Assessment Year | 1987 |
|---|---|
| Principal Product | ANIMAL FEED |
| NAICS |
n/a
|
| SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
| Sales Range | $10 M to 50M |
| # of Employees | 43 |
| Plant Area |
n/a
|
| Annual Production | 120,000
ton
|
| Production Hrs. Annual | 3,876
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $210,119 | 3,625,147 |
kWh
|
$0.058 |
| Natural Gas | $46,472 | 11,272 |
MMBtu
|
$4.12 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,060 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,390 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,670 | - | - |
$2,270
-
MMBtu
|
$(-600.0) | |
| 02 | 2.2136: Install / repair insulation on steam lines | $282 | $48 | - |
$282
-
MMBtu
|
- | |
| 03 | 2.2135: Repair and eliminate steam leaks | $13,300 | $130 | - |
$13,300
-
MMBtu
|
- | |
| 04 | 2.4133: Use most efficient type of electric motors | $1,316 | $1,534 |
$1,316
23,740
kWh
|
- | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,081 | - |
$1,081
19,343
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $140 | $61 |
$140
2,638
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $271 | - |
$271
4,689
kWh
|
- | - | |
| TOTAL RECOMMENDED | $18,060 | $1,773 |
$2,808
50,410
kWh
|
$15,852
-
MMBtu
|
$(-600.0) | ||
| TOTAL IMPLEMENTED | $16,390 | $1,773 |
$2,808
50,410
kWh
|
$13,582
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs