Assessment Year | 1997 |
---|---|
Principal Product | circuit board mounted power supplies |
NAICS |
n/a
|
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 276 |
Plant Area |
33,000
ft2
|
Annual Production | 1,144,000
pieces
|
Production Hrs. Annual | 4,862
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $66,941 | 1,881,887 |
kWh
|
$0.036 |
Electricity Demand | $25,447 | 4,239 |
kW-mo/yr
|
$6.00 |
Electricity Fees | $4,810 | - |
|
- |
LPG | $9,991 | 785 |
MMBtu
|
$12.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $231,345 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.421: Modify current incentive program | $118,000 | $10,000 | n/a | - | - | - | - | - | $118,000 |
02 | 4.445: Install equipment to move product | $56,055 | $50,060 | n/a | - | - | - | - | $56,055 | - |
03 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $32,660 | $11,800 | n/a |
$(-100.0)
(-2,052)
kWh
|
- | - |
$32,760
-
lb
|
- | - |
04 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $15,220 | $3,600 | n/a |
$(-60.0)
(-1,172)
kWh
|
- | - |
$17,360
-
lb
|
$(-2,080.0) | - |
05 | 2.6232: Install set-back timers | $7,910 | $3,520 | n/a |
$5,970
165,885
kWh
|
- |
$1,940
-
MMBtu
|
- | - | - |
06 | 2.7111: Reduce illumination to minimum necessary levels | $630 | $250 | n/a |
$340
9,379
kWh
|
$290
-
kW-mo/yr
|
- | - | - | - |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $525 | $1,120 | n/a |
$305
8,499
kWh
|
$220
-
kW-mo/yr
|
- | - | - | - |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $345 | $250 | n/a |
$200
5,569
kWh
|
$145
-
kW-mo/yr
|
- | - | - | - |
TOTAL RECOMMENDED | $231,345 | $80,600 |
$6,655
186,108
kWh
|
$655
-
kW-mo/yr
|
$1,940
-
MMBtu
|
$50,120
-
lb
|
$53,975 | $118,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs