ITAC Assessment: UU0023
ITAC logo
ITAC Assessment: UU0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Year Books
NAICS
n/a
SIC 2732: Book Printing
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 75,000
ft2
Annual Production 400,000
pieces
Production Hrs. Annual 4,940
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,949 1,585,800
kWh
Electricity Demand $42,822 402
kW-mo/yr
Electricity Fees $7,357 -
Natural Gas $19,476 3,439
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,503 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,843

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,845 $110 $1,249
27,219
kWh
$596
-
kW-mo/yr
-
02 2.4314: Use synthetic lubricant $833 $300 $623
13,582
kWh
$210
-
kW-mo/yr
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $16,303 $14,000 $12,843
279,970
kWh
$3,460
-
kW-mo/yr
-
04 3.4151: Minimize water usage $4,827 $18,490 - - $4,827
-
Tgal
05 3.4151: Minimize water usage $695 - - - $695
-
Tgal
TOTAL RECOMMENDED $24,503 $32,900 $14,715
320,771
kWh
$4,266
-
kW-mo/yr
$5,522
-
Tgal
TOTAL IMPLEMENTED $18,843 $14,110 $14,092
307,189
kWh
$4,056
-
kW-mo/yr
$695
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs