ITAC Assessment: CL1906
ITAC logo
ITAC Assessment: CL1906
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Various Printing, Brochures, flyers, maps, etc.
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 125,000
ft2
Annual Production 50,000
units
Production Hrs. Annual 2,500
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $154,978 2,642,198
kWh
Electricity Demand $62,634 7,425
kW-mo/yr
Electricity Fees $1,066 -
Natural Gas $45,660 59,598
MMBtu
Waste Disposal Costs
Water Usage $2,920 31
Tgal
Water Disposal $1,240 312
Tgal
TOTAL YEARLY COSTS $268,498
RECOMMENDED SAVINGS* $11,953 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,953

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,464 $12,357 $4,771
79,530
kWh
$2,693
-
kW-mo/yr
02 2.7111: Reduce illumination to minimum necessary levels $694 - $447
7,466
kWh
$247
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,979 $1,440 $1,778
29,624
kWh
$1,201
-
kW-mo/yr
04 2.7492: Use proper thickness of insulation on building envelope $816 $574 $816
13,606
kWh
-
TOTAL RECOMMENDED $11,953 $14,371 $7,812
130,226
kWh
$4,141
-
kW-mo/yr
TOTAL IMPLEMENTED $11,953 $14,371 $7,812
130,226
kWh
$4,141
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs