| Assessment Year | 1997 |
|---|---|
| Principal Product | Industrial metal-working tools (inserts) |
| NAICS |
n/a
|
| SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
| Sales Range | $100 M to 500M |
| # of Employees | 86 |
| Plant Area |
23,000
ft2
|
| Annual Production | 33,000,000
pieces
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $175,560 | 2,988,277 |
kWh
|
$0.059 |
| Electricity Demand | $28,084 | 8,906 |
kW-mo/yr
|
$3.15 |
| Electricity Fees | $816 | - |
|
- |
| Natural Gas | $6,415 | 1,082 |
MMBtu
|
$5.93 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $173,220 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,330 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.431: Train operators for maximum operating efficiency | $83,060 | $19,080 |
$(-100.0)
(-1,758)
kWh
|
- | - | - | - | $83,160 | - | |
| 02 | 3.8142: Distill contaminated solvents for reuse | $64,970 | $45,880 | - | - | - | - |
$16,830
-
gal
|
$1,160 | $46,980 | |
| 03 | 3.1242: Allow drainage before withdrawing object | $10,970 | $5,080 | - | - | - | - |
$3,130
-
gal
|
$260 | $7,580 | |
| 04 | 3.3131: Use evaporation to concentrate material | $8,030 | $20,880 |
$(-810.0)
(-40,445)
kWh
|
- | - |
$8,840
-
gal
|
- | - | - | |
| 05 | 2.7261: Install timers and/or thermostats | $5,330 | $6,200 |
$4,840
86,460
kWh
|
- |
$490
-
MMBtu
|
- | - | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $860 | $600 |
$740
13,189
kWh
|
$120
-
kW-mo/yr
|
- | - | - | - | - | |
| TOTAL RECOMMENDED | $173,220 | $97,720 |
$4,670
57,446
kWh
|
$120
-
kW-mo/yr
|
$490
-
MMBtu
|
$8,840
-
gal
|
$19,960
-
gal
|
$84,580 | $54,560 | ||
| TOTAL IMPLEMENTED | $5,330 | $6,200 |
$4,840
86,460
kWh
|
- |
$490
-
MMBtu
|
- | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs