Assessment Year | 1997 |
---|---|
Principal Product | Carbon copy and carbonless business forms |
NAICS |
n/a
|
SIC | 2761: Manifold Business Forms |
Sales Range | $5 M to 10M |
# of Employees | 63 |
Plant Area |
45,000
ft2
|
Annual Production | 780,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $39,538 | 1,439,625 |
kWh
|
$0.027 |
Electricity Demand | $16,372 | 3,888 |
kW-mo/yr
|
$4.21 |
Electricity Fees | $6,710 | - |
|
- |
Natural Gas | $3,438 | 528 |
MMBtu
|
$6.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,050 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,000 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.322: Eliminate old stock and modify inventory control | $10,600 | $11,400 | - | - | - | - | - | - | $10,600 | |
02 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $8,970 | $12,600 |
$(-50.0)
(-1,758)
kWh
|
- | - | - |
$9,070
-
lb
|
$(-50.0) | - | |
03 | 3.5217: Reuse / recycle/ sell paper products | $4,940 | $2,400 | - | - | - | - |
$6,760
-
lb
|
$(-1,820.0) | - | |
04 | 2.6225: Eliminate third shift | $3,940 | - |
$3,940
145,955
kWh
|
- | - | - | - | - | - | |
05 | 2.7261: Install timers and/or thermostats | $1,300 | $240 |
$300
11,137
kWh
|
- | - |
$1,000
-
MMBtu
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $650 | $500 |
$400
14,654
kWh
|
$250
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $480 | - |
$280
10,258
kWh
|
$200
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $170 | $470 |
$130
4,689
kWh
|
- | $40 | - | - | - | - | |
TOTAL RECOMMENDED | $31,050 | $27,610 |
$5,000
184,935
kWh
|
$450
-
kW-mo/yr
|
$40 |
$1,000
-
MMBtu
|
$15,830
-
lb
|
$(-1,870.0) | $10,600 | ||
TOTAL IMPLEMENTED | $22,000 | $24,740 |
$930
34,291
kWh
|
$450
-
kW-mo/yr
|
- |
$1,000
-
MMBtu
|
$9,070
-
lb
|
$(-50.0) | $10,600 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs