Assessment Year | 1997 |
---|---|
Principal Product | Ready-to-assemble wooden furniture |
NAICS |
n/a
|
SIC | 2521: Wood Office Furniture |
Sales Range | $10 M to 50M |
# of Employees | 347 |
Plant Area |
300,000
ft2
|
Annual Production | 130,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $162,993 | 7,876,905 |
kWh
|
$0.021 |
Electricity Demand | $75,708 | 13,376 |
kW-mo/yr
|
$5.66 |
Electricity Fees | $90,583 | - |
|
- |
LPG | $60,060 | 8,594 |
MMBtu
|
$6.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $220,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $87,170 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.421: Modify current incentive program | $105,000 | $10,000 | - | - | - | - | $(-25,000.0) | $130,000 | |
02 | 3.1192: Reduce scrap production | $62,970 | $9,000 |
$(-800.0)
(-49,824)
kWh
|
- | - |
$63,770
-
lb
|
- | - | |
03 | 2.6225: Eliminate third shift | $20,340 | $4,000 |
$25,420
1,588,511
kWh
|
- | - | - | $(-5,080.0) | - | |
04 | 3.4156: Use flow control valves on equipment to optimize water use | $6,580 | - | - | - |
$14,690
-
gal
|
$(-8,110.0)
-
lb
|
- | - | |
05 | 2.6242: Minimize operation of equipment maintained in standby condition | $9,100 | $3,775 |
$9,100
568,581
kWh
|
- | - | - | - | - | |
06 | 3.6192: Use a less expensive method of waste removal | $8,925 | $6,000 | - | - | - |
$8,925
-
lb
|
- | - | |
07 | 2.2511: Insulate bare equipment | $3,140 | $410 |
$3,140
196,366
kWh
|
- | - | - | - | - | |
08 | 2.3212: Optimize plant power factor | $2,500 | $5,675 | - |
$2,500
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,360 | $2,590 |
$610
38,101
kWh
|
$750
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.7261: Install timers and/or thermostats | $985 | $535 |
$985
61,547
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $220,900 | $41,985 |
$38,455
2,403,282
kWh
|
$3,250
-
kW-mo/yr
|
$14,690
-
gal
|
$64,585
-
lb
|
$(-30,080.0) | $130,000 | ||
TOTAL IMPLEMENTED | $87,170 | $21,265 |
$25,230
1,576,788
kWh
|
$3,250
-
kW-mo/yr
|
- |
$63,770
-
lb
|
$(-5,080.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs