ITAC Assessment: TN0600
ITAC logo
ITAC Assessment: TN0600
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Ready-to-assemble wooden furniture
NAICS
n/a
SIC 2521: Wood Office Furniture
Sales Range $10
M
to 50
M
# of Employees 347
Plant Area 300,000
ft2
Annual Production 130,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,993 7,876,905
kWh
Electricity Demand $75,708 13,376
kW-mo/yr
Electricity Fees $90,583 -
LPG $60,060 8,594
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $220,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $87,170

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings
01 4.421: Modify current incentive program $105,000 $10,000 - - - - $(-25,000.0) $130,000
02 3.1192: Reduce scrap production $62,970 $9,000 $(-800.0)
(-49,824)
kWh
- - $63,770
-
lb
- -
03 2.6225: Eliminate third shift $20,340 $4,000 $25,420
1,588,511
kWh
- - - $(-5,080.0) -
04 3.4156: Use flow control valves on equipment to optimize water use $6,580 - - - $14,690
-
gal
$(-8,110.0)
-
lb
- -
05 2.6242: Minimize operation of equipment maintained in standby condition $9,100 $3,775 $9,100
568,581
kWh
- - - - -
06 3.6192: Use a less expensive method of waste removal $8,925 $6,000 - - - $8,925
-
lb
- -
07 2.2511: Insulate bare equipment $3,140 $410 $3,140
196,366
kWh
- - - - -
08 2.3212: Optimize plant power factor $2,500 $5,675 - $2,500
-
kW-mo/yr
- - - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,360 $2,590 $610
38,101
kWh
$750
-
kW-mo/yr
- - - -
10 2.7261: Install timers and/or thermostats $985 $535 $985
61,547
kWh
- - - - -
TOTAL RECOMMENDED $220,900 $41,985 $38,455
2,403,282
kWh
$3,250
-
kW-mo/yr
$14,690
-
gal
$64,585
-
lb
$(-30,080.0) $130,000
TOTAL IMPLEMENTED $87,170 $21,265 $25,230
1,576,788
kWh
$3,250
-
kW-mo/yr
- $63,770
-
lb
$(-5,080.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs