ITAC Assessment: TN0599
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Commercial aluminum-framed windows
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 149
Plant Area 147,000
ft2
Annual Production 52,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,288 1,385,111
kWh
Electricity Demand $30,412 5,053
kW-mo/yr
Electricity Fees $5,350 -
Natural Gas $42,837 6,380
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $449,520 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings By-product Production Savings
01 4.445: Install equipment to move product $155,710 $69,000 $(-90.0)
(-2,931)
kWh
$(-200.0)
-
kW-mo/yr
- - $156,000 - -
02 3.1172: Revise raw material specs $128,770 - - - - $197,000
-
lb
$(-70,000.0) $1,770 -
03 3.5313: Increase amount of waste recovered for resale $92,330 $32,900 - - - $7,240
-
lb
$35,090 - $50,000
04 3.1172: Revise raw material specs $50,700 - - - - $50,700
-
lb
- - -
05 2.7261: Install timers and/or thermostats $19,720 $3,400 $1,820
58,617
kWh
- $17,900
-
MMBtu
- - - -
06 2.7145: Install skylights $1,180 $1,000 $1,180
38,101
kWh
- - - - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,110 $1,110 $230
7,327
kWh
$880
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $449,520 $107,410 $3,140
101,114
kWh
$680
-
kW-mo/yr
$17,900
-
MMBtu
$254,940
-
lb
$121,090 $1,770 $50,000
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs