ITAC Assessment: UA0095
ITAC logo
ITAC Assessment: UA0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Automotive Parts
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 360
Plant Area 267,000
ft2
Annual Production 8,400,000
lb
Production Hrs. Annual 5,520
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,208,506 22,878,928
kWh
Electricity Demand $192,847 46,908
kW-mo/yr
Electricity Fees $90,058 -
Natural Gas $34,670 2,955
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,314 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $24,807 $4,500 $21,148
400,370
kWh
$2,556
-
kW-mo/yr
$1,103
02 2.4231: Reduce the pressure of compressed air to the minimum required $6,789 $800 $5,052
95,652
kWh
$1,435
-
kW-mo/yr
$302
03 2.2624: Use cold waste water to cool chiller feed water $18,583 $59,040 $17,757
336,182
kWh
- $826
04 2.7122: Disconnect ballasts $573 $324 $470
8,903
kWh
$78
-
kW-mo/yr
$25
05 2.7135: Install occupancy sensors $562 $1,759 $537
10,175
kWh
- $25
TOTAL RECOMMENDED $51,314 $66,423 $44,964
851,282
kWh
$4,069
-
kW-mo/yr
$2,281
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs