ITAC Assessment: TN0590
ITAC logo
ITAC Assessment: TN0590
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Motor actuators and thermal controls
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 290
Plant Area 93,000
ft2
Annual Production 9,000,000
pieces
Production Hrs. Annual 5,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,654 5,611,372
kWh
Electricity Demand $62,499 12,068
kW-mo/yr
Natural Gas $9,786 1,928
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $168,886 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $167,561

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 3.1163: Use plastic pallets instead of wood $162,200 $297,300 - - - - - $162,200 -
02 3.5316: Contract a wood pallet recycling company $2,400 - - - - - - $2,400 -
03 2.2437: Recover waste heat from equipment $2,321 $8,150 - - $2,321
-
MMBtu
- - - -
04 2.4221: Install compressor air intakes in coolest locations $1,325 $260 $703
31,946
kWh
$622
-
kW-mo/yr
- - - - -
05 3.5313: Increase amount of waste recovered for resale $640 $1,120 $(-500.0)
(-22,274)
kWh
- - $250
-
lb
$(-750.0) - $1,640
TOTAL RECOMMENDED $168,886 $306,830 $203
9,672
kWh
$622
-
kW-mo/yr
$2,321
-
MMBtu
$250
-
lb
$(-750.0) $164,600 $1,640
TOTAL IMPLEMENTED $167,561 $306,570 $(-500.0)
(-22,274)
kWh
- $2,321
-
MMBtu
$250
-
lb
$(-750.0) $164,600 $1,640
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs