Assessment Year | 1996 |
---|---|
Principal Product | Business Printed Matter |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $5 M to 10M |
# of Employees | 72 |
Plant Area |
33,000
ft2
|
Annual Production | 3,800,000
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $35,420 | 1,000,879 |
kWh
|
$0.035 |
Electricity Demand | $15,006 | 2,483 |
kW-mo/yr
|
$6.04 |
Natural Gas | $2,087 | 322 |
MMBtu
|
$6.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $307,454 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $91,814 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.1191: Change procedures / equipment / operating conditions | $214,400 | $208,880 | - | - |
$208,000
-
lb
|
$6,400 | - | |
02 | 3.2176: Increase use of automation | $87,771 | $254,000 | - | - |
$109,871
-
lb
|
- | $(-22,100.0) | |
03 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,294 | $8,300 |
$(-100.0)
(-3,224)
kWh
|
- | - | - | $2,394 | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,637 | $2,500 |
$967
32,239
kWh
|
$670
-
kW-mo/yr
|
- | - | - | |
05 | 2.7261: Install timers and/or thermostats | $1,240 | $580 |
$1,240
41,325
kWh
|
- | - | - | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $112 | $175 |
$62
2,052
kWh
|
$50
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $307,454 | $474,435 |
$2,169
72,392
kWh
|
$720
-
kW-mo/yr
|
$317,871
-
lb
|
$6,400 | $(-19,706.0) | ||
TOTAL IMPLEMENTED | $91,814 | $264,975 |
$929
31,067
kWh
|
$720
-
kW-mo/yr
|
$109,871
-
lb
|
- | $(-19,706.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs