ITAC Assessment: AR0186
ITAC logo
ITAC Assessment: AR0186
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Discounted Office Furniture
NAICS
n/a
SIC 2521: Wood Office Furniture
Sales Range greater than $500
M
# of Employees 400
Plant Area 657,384
ft2
Annual Production 997,000
pieces
Production Hrs. Annual 5,616
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $378,695 13,792,497
kWh
Electricity Demand $167,798 33,724
kW-mo/yr
Natural Gas $43,022 6,483
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,369 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,780

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,117 $23,976 $11,122
300,996
kWh
$2,995
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $8,772 $800 $7,297
215,709
kWh
$1,475
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $17,663 $54,855 - $17,663
-
kW-mo/yr
- -
04 3.5216: Recycle nonferrous dust $28,860 - - - $28,860
-
lb
-
05 4.513: Re-arrange equipment layout to reduce labor costs $26,957 $400 - - - $26,957
TOTAL RECOMMENDED $96,369 $80,031 $18,419
516,705
kWh
$22,133
-
kW-mo/yr
$28,860
-
lb
$26,957
TOTAL IMPLEMENTED $31,780 $78,831 $11,122
300,996
kWh
$20,658
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs