ITAC Assessment: TN0568
ITAC logo
ITAC Assessment: TN0568
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Automotive high-pressure flexible hose connectors
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 388
Plant Area 75,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 5,760
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,288 4,011,723
kWh
Electricity Demand $86,317 9,030
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,019 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,383

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 3.8211: Convert to aqueous cleaning system $34,986 $10,700 - - - $(-1,100.0)
-
gal
$36,086
-
gal
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $26,602 $13,880 $11,230
320,926
kWh
$24,346
-
kW-mo/yr
$(-8,974.0)
-
MMBtu
- - - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,795 $13,800 $3,765
107,562
kWh
$13,030
-
kW-mo/yr
$(-3,000.0)
-
MMBtu
- - - -
04 2.2437: Recover waste heat from equipment $2,810 $11,100 $2,810
80,305
kWh
- - - - - -
05 2.6231: Utilize controls to operate equipment only when needed $2,810 $8,400 $2,810
80,305
kWh
- - - - - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,739 $5,200 $(-500.0)
(-14,361)
kWh
- - - - $2,739
-
lb
$(-500.0)
07 2.7124: Make a practice of turning off lights when not needed $277 - $277
7,913
kWh
- - - - - -
TOTAL RECOMMENDED $83,019 $63,080 $20,392
582,650
kWh
$37,376
-
kW-mo/yr
$(-11,974.0)
-
MMBtu
$(-1,100.0)
-
gal
$36,086
-
gal
$2,739
-
lb
$(-500.0)
TOTAL IMPLEMENTED $75,383 $38,380 $14,995
428,488
kWh
$37,376
-
kW-mo/yr
$(-11,974.0)
-
MMBtu
$(-1,100.0)
-
gal
$36,086
-
gal
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs