ITAC Assessment: SD0501
ITAC logo
ITAC Assessment: SD0501
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Biopharmaceuticals
NAICS 423450: Medical, Dental, and Hospital Equipment and Supplies Merchant Wholesalers
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 633
Plant Area 274,364
ft2
Annual Production 1,000,000,000
units
Production Hrs. Annual 4,800
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $558,011 6,978,347
kWh
Electricity Demand $238,069 13,602
kW-mo/yr
Natural Gas $874,011 90,357
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,814 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,991 $20,850 $27,991
349,885
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,118 $9,600 $11,063
138,282
kWh
$15,055
-
Tgal
03 2.7241: Install outside air damper / economizer on hvac unit $16,800 $2,000 $16,800
168,000
kWh
-
04 2.4133: Use most efficient type of electric motors $10,905 $13,511 $10,905
103,310
kWh
-
TOTAL RECOMMENDED $81,814 $45,961 $66,759
759,477
kWh
$15,055
-
Tgal
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs