ITAC Assessment: TN0561
ITAC logo
ITAC Assessment: TN0561
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Master cylinders, drum brakes and vacuum boosters
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 285
Plant Area 175,000
ft2
Annual Production 4,470,000
pieces
Production Hrs. Annual 7,056
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $732,258 15,260,258
kWh
Natural Gas $72,506 12,394
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,045 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 2.3191: Use demand controller or load shedder $36,158 $15,600 n/a $36,158
868,699
kWh
- - -
02 2.7261: Install timers and/or thermostats $7,772 $580 n/a $7,141
230,363
kWh
$631
-
MMBtu
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,709 $3,775 n/a $6,709
82,649
kWh
- - -
04 2.7111: Reduce illumination to minimum necessary levels $3,227 - n/a $3,227
70,633
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,256 - n/a $3,256
61,547
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $470 $196 n/a $470
8,499
kWh
- - -
07 3.5311: Recover and reuse waste material $15,669 $50,000 n/a - - - $15,669
-
lb
08 3.1191: Change procedures / equipment / operating conditions $10,981 $10,000 n/a - - $10,981
-
gal
-
09 3.7131: Use a rag recycle service $3,274 $713 n/a - - - $3,274
-
lb
10 3.5315: Lease / purchase baler; sell cardboard to recycler $529 - n/a - - - $529
-
lb
TOTAL RECOMMENDED $88,045 $80,864 $56,961
1,322,390
kWh
$631
-
MMBtu
$10,981
-
gal
$19,472
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs