Assessment Year | 1995 |
---|---|
Principal Product | Master cylinders, drum brakes and vacuum boosters |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 285 |
Plant Area |
175,000
ft2
|
Annual Production | 4,470,000
pieces
|
Production Hrs. Annual | 7,056
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $732,258 | 15,260,258 |
kWh
|
$0.048 |
Natural Gas | $72,506 | 12,394 |
MMBtu
|
$5.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $88,045 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $36,158 | $15,600 | n/a |
$36,158
868,699
kWh
|
- | - | - |
02 | 2.7261: Install timers and/or thermostats | $7,772 | $580 | n/a |
$7,141
230,363
kWh
|
$631
-
MMBtu
|
- | - |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,709 | $3,775 | n/a |
$6,709
82,649
kWh
|
- | - | - |
04 | 2.7111: Reduce illumination to minimum necessary levels | $3,227 | - | n/a |
$3,227
70,633
kWh
|
- | - | - |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,256 | - | n/a |
$3,256
61,547
kWh
|
- | - | - |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $470 | $196 | n/a |
$470
8,499
kWh
|
- | - | - |
07 | 3.5311: Recover and reuse waste material | $15,669 | $50,000 | n/a | - | - | - |
$15,669
-
lb
|
08 | 3.1191: Change procedures / equipment / operating conditions | $10,981 | $10,000 | n/a | - | - |
$10,981
-
gal
|
- |
09 | 3.7131: Use a rag recycle service | $3,274 | $713 | n/a | - | - | - |
$3,274
-
lb
|
10 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $529 | - | n/a | - | - | - |
$529
-
lb
|
TOTAL RECOMMENDED | $88,045 | $80,864 |
$56,961
1,322,390
kWh
|
$631
-
MMBtu
|
$10,981
-
gal
|
$19,472
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs