ITAC Assessment: TN0105
ITAC logo
ITAC Assessment: TN0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product CORRUGATED PAPER PRODUCTS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 360,000,000
thousand feet
Production Hrs. Annual 4,250
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,714 3,009,379
kWh
Natural Gas $82,358 26,277
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,026 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $1,189 $450 - $1,189
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $824 $320 - $824
-
MMBtu
03 2.6212: Turn off equipment during breaks, reduce operating time $3,800 - $3,800
99,648
kWh
-
04 2.7494: Install storm windows and doors $213 $1,267 - $213
-
MMBtu
TOTAL RECOMMENDED $6,026 $2,037 $3,800
99,648
kWh
$2,226
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs