Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Processed Chicken
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 441
Plant Area 74,933
ft2
Annual Production 22,100,000
pieces
Production Hrs. Annual 6,096
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,192 3,767,680
kWh
Electricity Demand $161,379 7,630
kW-mo/yr
Electricity Fees $16,815 -
Natural Gas $90,381 15,210
MMBtu
Waste Disposal Costs
Water Usage $77,658 25,965
Tgal
Water Disposal $278,233 26,296
Tgal
TOTAL YEARLY COSTS $718,658
RECOMMENDED SAVINGS* $129,931 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,988

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.4151: Minimize water usage $75,018 $1,383 - - $21,506
-
MMBtu
$11,793
-
Tgal
$41,719
-
Tgal
- -
02 3.4155: Meter waste water $41,210 $15,000 - - - - $41,210
-
Tgal
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,600 $6,024 $4,168
166,738
kWh
$6,432
-
kW-mo/yr
- - - - -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,234 $230 - $1,234
-
kW-mo/yr
- - - - -
05 3.5311: Recover and reuse waste material $925 $5,160 - - - - - $230 $695
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $643 $1,700 $1,111
44,460
kWh
- - - - $(-368.0) $(-100.0)
07 2.4221: Install compressor air intakes in coolest locations $301 $1,148 $301
12,048
kWh
- - - - - -
TOTAL RECOMMENDED $129,931 $30,645 $5,580
223,246
kWh
$7,666
-
kW-mo/yr
$21,506
-
MMBtu
$11,793
-
Tgal
$82,929
-
Tgal
$(-138.0) $595
TOTAL IMPLEMENTED $53,988 $24,102 $5,580
223,246
kWh
$7,666
-
kW-mo/yr
- - $41,210
-
Tgal
$(-368.0) $(-100.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings