Assessment Year | 2020 |
---|---|
Principal Product | Processed Chicken |
NAICS | 311615: Poultry Processing |
SIC | 2015: Poultry Slaughtering and Processing |
Sales Range | $100 M to 500M |
# of Employees | 441 |
Plant Area |
74,933
ft2
|
Annual Production | 22,100,000
pieces
|
Production Hrs. Annual | 6,096
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $94,192 | 3,767,680 |
kWh
|
$0.025 | |
Electricity Demand | $161,379 | 7,630 |
kW-mo/yr
|
$21.15 | |
Electricity Fees | $16,815 | - |
|
- | |
Natural Gas | $90,381 | 15,210 |
MMBtu
|
$5.94 | |
Waste Disposal Costs | |||||
Water Usage | $77,658 | 25,965 |
Tgal
|
$2.99 | |
Water Disposal | $278,233 | 26,296 |
Tgal
|
$10.58 | |
TOTAL YEARLY COSTS | $718,658 | ||||
RECOMMENDED SAVINGS* | $129,931 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $53,988 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.4151: Minimize water usage | $75,018 | $1,383 | - | - |
$21,506
-
MMBtu
|
$11,793
-
Tgal
|
$41,719
-
Tgal
|
- | - | |
02 | 3.4155: Meter waste water | $41,210 | $15,000 | - | - | - | - |
$41,210
-
Tgal
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,600 | $6,024 |
$4,168
166,738
kWh
|
$6,432
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,234 | $230 | - |
$1,234
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 3.5311: Recover and reuse waste material | $925 | $5,160 | - | - | - | - | - | $230 | $695 | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $643 | $1,700 |
$1,111
44,460
kWh
|
- | - | - | - | $(-368.0) | $(-100.0) | |
07 | 2.4221: Install compressor air intakes in coolest locations | $301 | $1,148 |
$301
12,048
kWh
|
- | - | - | - | - | - | |
TOTAL RECOMMENDED | $129,931 | $30,645 |
$5,580
223,246
kWh
|
$7,666
-
kW-mo/yr
|
$21,506
-
MMBtu
|
$11,793
-
Tgal
|
$82,929
-
Tgal
|
$(-138.0) | $595 | ||
TOTAL IMPLEMENTED | $53,988 | $24,102 |
$5,580
223,246
kWh
|
$7,666
-
kW-mo/yr
|
- | - |
$41,210
-
Tgal
|
$(-368.0) | $(-100.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs