ITAC Assessment: TN0559
ITAC logo
ITAC Assessment: TN0559
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product small electric motors
NAICS
n/a
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $50
M
to 100
M
# of Employees 474
Plant Area 226,000
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 4,165
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $983,163 22,361,372
kWh
Natural Gas $122,028 38,036
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $455,954 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $242,207

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 2.7261: Install timers and/or thermostats $9,785 $5,640 $3,871
148,886
kWh
$5,914
-
MMBtu
- -
02 2.7243: Improve air circulation with destratification fans / other methods $3,680 $12,800 - $3,680
-
MMBtu
- -
03 2.2437: Recover waste heat from equipment $2,531 $3,600 - $2,531
-
MMBtu
- -
04 2.4221: Install compressor air intakes in coolest locations $4,207 $990 $4,207
75,029
kWh
- - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $17,212 $6,100 $20,175
211,606
kWh
$(-2,963.0)
-
MMBtu
- -
06 3.5248: Separate and recycle scrap metal to foundry or for sale $238,000 $2,250 - - - $238,000
-
lb
07 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $119,243 $20,200 - - $119,243
-
gal
-
08 3.3131: Use evaporation to concentrate material $61,296 $75,000 - - $61,296
-
gal
-
TOTAL RECOMMENDED $455,954 $126,580 $28,253
435,521
kWh
$9,162
-
MMBtu
$180,539
-
gal
$238,000
-
lb
TOTAL IMPLEMENTED $242,207 $3,240 $4,207
75,029
kWh
- - $238,000
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs