Assessment Year | 1995 |
---|---|
Principal Product | small electric motors |
NAICS |
n/a
|
SIC | 3316: Cold-Rolled Steel Sheet, Strip, and Bars |
Sales Range | $50 M to 100M |
# of Employees | 474 |
Plant Area |
226,000
ft2
|
Annual Production | 12,000,000
pieces
|
Production Hrs. Annual | 4,165
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $983,163 | 22,361,372 |
kWh
|
$0.044 |
Natural Gas | $122,028 | 38,036 |
MMBtu
|
$3.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $455,954 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $242,207 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $9,785 | $5,640 |
$3,871
148,886
kWh
|
$5,914
-
MMBtu
|
- | - | |
02 | 2.7243: Improve air circulation with destratification fans / other methods | $3,680 | $12,800 | - |
$3,680
-
MMBtu
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $2,531 | $3,600 | - |
$2,531
-
MMBtu
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $4,207 | $990 |
$4,207
75,029
kWh
|
- | - | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $17,212 | $6,100 |
$20,175
211,606
kWh
|
$(-2,963.0)
-
MMBtu
|
- | - | |
06 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $238,000 | $2,250 | - | - | - |
$238,000
-
lb
|
|
07 | 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid | $119,243 | $20,200 | - | - |
$119,243
-
gal
|
- | |
08 | 3.3131: Use evaporation to concentrate material | $61,296 | $75,000 | - | - |
$61,296
-
gal
|
- | |
TOTAL RECOMMENDED | $455,954 | $126,580 |
$28,253
435,521
kWh
|
$9,162
-
MMBtu
|
$180,539
-
gal
|
$238,000
-
lb
|
||
TOTAL IMPLEMENTED | $242,207 | $3,240 |
$4,207
75,029
kWh
|
- | - |
$238,000
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs