ITAC Assessment: TN0554
ITAC logo
ITAC Assessment: TN0554
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Precision sheet metal fabrication
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 750
Plant Area 87,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 5,148
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,943 1,127,784
kWh
Natural Gas $10,455 1,489
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,737 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,640

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7144: Install spectral reflectors / delamp $5,277 $19,760 $5,277
96,424
kWh
- -
02 2.7261: Install timers and/or thermostats $2,636 $680 $2,181
72,685
kWh
$455
-
MMBtu
-
03 2.7243: Improve air circulation with destratification fans / other methods $1,379 $3,800 - $1,379
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $343 $820 $343
14,361
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $431 $990 $431
3,517
kWh
- -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,625 - $1,625
-
kWh
- -
07 2.8113: Purchase gas directly from a contract gas supplier $1,046 - - - $1,046
TOTAL RECOMMENDED $12,737 $26,050 $9,857
186,987
kWh
$1,834
-
MMBtu
$1,046
TOTAL IMPLEMENTED $5,640 $4,480 $3,806
72,685
kWh
$1,834
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs