ITAC Assessment: TN0551
ITAC logo
ITAC Assessment: TN0551
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Lithium hydroxide monohydrate and lithium hydroxide anhydrou
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 300,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,907 4,536,049
kWh
Fuel Oil #2 $417,337 111,101
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,312 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,756

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.2136: Install / repair insulation on steam lines $5,639 $2,700 - $5,639
-
MMBtu
02 2.2511: Insulate bare equipment $3,753 $790 - $3,753
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,133 $1,410 $3,133
71,219
kWh
-
04 2.7124: Make a practice of turning off lights when not needed $623 - $623
14,068
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $164 $520 $164
8,206
kWh
-
TOTAL RECOMMENDED $13,312 $5,420 $3,920
93,493
kWh
$9,392
-
MMBtu
TOTAL IMPLEMENTED $3,756 $1,410 $3,756
85,287
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs