Assessment Year | 1995 |
---|---|
Principal Product | Lithium hydroxide monohydrate and lithium hydroxide anhydrou |
NAICS |
n/a
|
SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 35 |
Plant Area |
300,000
ft2
|
Annual Production | 6,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $169,907 | 4,536,049 |
kWh
|
$0.037 |
Fuel Oil #2 | $417,337 | 111,101 |
MMBtu
|
$3.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,312 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,756 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $5,639 | $2,700 | - |
$5,639
-
MMBtu
|
|
02 | 2.2511: Insulate bare equipment | $3,753 | $790 | - |
$3,753
-
MMBtu
|
|
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,133 | $1,410 |
$3,133
71,219
kWh
|
- | |
04 | 2.7124: Make a practice of turning off lights when not needed | $623 | - |
$623
14,068
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $164 | $520 |
$164
8,206
kWh
|
- | |
TOTAL RECOMMENDED | $13,312 | $5,420 |
$3,920
93,493
kWh
|
$9,392
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,756 | $1,410 |
$3,756
85,287
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs