ITAC Assessment: TN0549
ITAC logo
ITAC Assessment: TN0549
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Industrial heat exchanger units
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 75,000
ft2
Annual Production 120
pieces
Production Hrs. Annual 4,250
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,666 2,973,916
kWh
Natural Gas $21,190 3,704
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,513 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $890

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7261: Install timers and/or thermostats $890 $1,520 $890
17,878
kWh
02 2.7447: Install vinyl strip / high speed / air curtain doors $3,249 $4,640 $3,249
167,057
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,374 $770 $2,374
52,755
kWh
TOTAL RECOMMENDED $6,513 $6,930 $6,513
237,690
kWh
TOTAL IMPLEMENTED $890 $1,520 $890
17,878
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs