ITAC Assessment: TN0547
ITAC logo
ITAC Assessment: TN0547
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Pre-engineered metal buildings
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 185,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 7,344
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,166 1,827,374
kWh
Natural Gas $40,077 6,747
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,189

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $8,342 $5,800 $1,604
50,117
kWh
$6,738
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,062 $1,800 $1,062
33,411
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $716 $468 $716
14,947
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $131 $98 $131
4,103
kWh
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,135 - $1,135
-
kWh
-
TOTAL RECOMMENDED $11,386 $8,166 $4,648
102,578
kWh
$6,738
-
MMBtu
TOTAL IMPLEMENTED $9,189 $6,366 $2,451
69,167
kWh
$6,738
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs