Assessment Year | 1995 |
---|---|
Principal Product | Pre-engineered metal buildings |
NAICS |
n/a
|
SIC | 3448: Prefabricated Metal Buildings and Components |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
185,000
ft2
|
Annual Production | 40,000
ton
|
Production Hrs. Annual | 7,344
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $104,166 | 1,827,374 |
kWh
|
$0.057 |
Natural Gas | $40,077 | 6,747 |
MMBtu
|
$5.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,386 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,189 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $8,342 | $5,800 |
$1,604
50,117
kWh
|
$6,738
-
MMBtu
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,062 | $1,800 |
$1,062
33,411
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $716 | $468 |
$716
14,947
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $131 | $98 |
$131
4,103
kWh
|
- | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,135 | - |
$1,135
-
kWh
|
- | |
TOTAL RECOMMENDED | $11,386 | $8,166 |
$4,648
102,578
kWh
|
$6,738
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,189 | $6,366 |
$2,451
69,167
kWh
|
$6,738
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs