ITAC Assessment: TN0543
ITAC logo
ITAC Assessment: TN0543
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Pizza Crust
NAICS
n/a
SIC 2045: Prepared Flour Mixes and Doughs
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 60,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,736
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,655 2,508,793
kWh
Natural Gas $117,334 24,379
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,847 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,971

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $3,782 $910 - $3,782
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,817 $1,400 $1,817
34,584
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $1,232 - $1,232
24,033
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $739 $331 $739
14,068
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $277 $270 $277
5,275
kWh
-
TOTAL RECOMMENDED $7,847 $2,911 $4,065
77,960
kWh
$3,782
-
MMBtu
TOTAL IMPLEMENTED $1,971 $331 $1,971
38,101
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs