ITAC Assessment: TN0540
ITAC logo
ITAC Assessment: TN0540
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Upholstery and fabric for the furniture industry
NAICS
n/a
SIC 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk
Sales Range $50
M
to 100
M
# of Employees 328
Plant Area 250,000
ft2
Annual Production 360,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $753,957 16,407,679
kWh
Natural Gas $24,268 4,502
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,780 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,366

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $5,373 $2,280 - $5,373
-
MMBtu
02 2.2511: Insulate bare equipment $4,639 $2,070 - $4,639
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $15,295 $17,920 $15,295
224,795
kWh
-
04 2.7261: Install timers and/or thermostats $3,993 $2,290 $3,923
85,287
kWh
$70
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,361 - $4,361
62,720
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,119 $1,845 $5,119
51,583
kWh
-
TOTAL RECOMMENDED $38,780 $26,405 $28,698
424,385
kWh
$10,082
-
MMBtu
TOTAL IMPLEMENTED $9,366 $4,570 $3,923
85,287
kWh
$5,443
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs