ITAC Assessment: TN0538
ITAC logo
ITAC Assessment: TN0538
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Aircraft and missile components
NAICS
n/a
SIC 3463: Nonferrous Forgings
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 150,000
ft2
Annual Production 11,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,371 2,109,613
kWh
Natural Gas $33,121 3,812
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,046 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,208

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7111: Reduce illumination to minimum necessary levels $3,201 - $3,201
56,272
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,149 - $2,149
21,981
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,115 $253 $1,115
8,792
kWh
04 2.4221: Install compressor air intakes in coolest locations $471 $810 $471
7,913
kWh
05 2.6231: Utilize controls to operate equipment only when needed $218 $435 $218
7,034
kWh
06 2.3212: Optimize plant power factor $4,892 $5,000 $4,892
-
kWh
TOTAL RECOMMENDED $12,046 $6,498 $12,046
101,992
kWh
TOTAL IMPLEMENTED $9,208 $5,253 $9,208
65,064
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs