ITAC Assessment: TN0536
ITAC logo
ITAC Assessment: TN0536
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Platform,dump,and dropframe truck trailers
NAICS
n/a
SIC 3715: Truck Trailers
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 160,000
ft2
Annual Production 3,640
pieces
Production Hrs. Annual 4,615
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,403 3,652,696
kWh
Natural Gas $188,190 29,811
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $504,582 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $501,058

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $25,358 $11,960 - $25,358
-
MMBtu
- - -
02 2.7491: Insulate glazing, walls, ceilings, and roofs $2,818 $2,816 - $2,818
-
MMBtu
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,717 - $2,717
37,222
kWh
- - - -
04 2.6218: Turn off equipment when not in use $2,311 - $2,311
31,653
kWh
- - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,161 $2,055 $2,161
29,601
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,869 $980 $1,869
25,498
kWh
- - - -
07 2.6212: Turn off equipment during breaks, reduce operating time $706 $1,835 $706
9,672
kWh
- - - -
08 2.6212: Turn off equipment during breaks, reduce operating time $642 - $642
8,792
kWh
- - - -
09 3.2121: Convert to electrostatic powder coating $442,969 $62,448 - - $442,969
-
Tgal
- -
10 3.8143: Recycle cleaning solvent and reuse $17,087 $26,320 - - - $17,087
-
gal
-
11 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,944 $8,480 - - - - $5,944
-
gal
TOTAL RECOMMENDED $504,582 $116,894 $10,406
142,438
kWh
$28,176
-
MMBtu
$442,969
-
Tgal
$17,087
-
gal
$5,944
-
gal
TOTAL IMPLEMENTED $501,058 $112,243 $9,700
132,766
kWh
$25,358
-
MMBtu
$442,969
-
Tgal
$17,087
-
gal
$5,944
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs