ITAC Assessment: TN0535
ITAC logo
ITAC Assessment: TN0535
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Industrial and commercial equipment tire retread materials a
NAICS
n/a
SIC 3011: Tires and Inner Tubes
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 80,000
ft2
Annual Production 47,500,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $656,407 12,917,937
kWh
Natural Gas $193,765 41,215
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $226,653 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,845

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 2.7231: Use radiant heater for spot heating $10,406 $28,960 - $10,406
-
MMBtu
- -
02 2.7447: Install vinyl strip / high speed / air curtain doors $9,687 $660 - $9,687
-
MMBtu
- -
03 2.6218: Turn off equipment when not in use $5,456 - $5,456
106,975
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,556 $1,248 $2,556
50,117
kWh
- - -
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,943 - $1,943
38,101
kWh
- - -
06 2.6218: Turn off equipment when not in use $1,794 - $1,794
35,170
kWh
- - -
07 2.7111: Reduce illumination to minimum necessary levels $1,256 - $1,256
24,619
kWh
- - -
08 2.4314: Use synthetic lubricant $1,121 - $1,121
21,981
kWh
- - -
09 2.2511: Insulate bare equipment $315 $145 - $315
-
MMBtu
- -
10 2.7243: Improve air circulation with destratification fans / other methods $987 $3,000 $987
19,343
kWh
- - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $209 $179 $209
4,103
kWh
- - -
12 3.1191: Change procedures / equipment / operating conditions $154,581 $34,400 - - - $154,581
-
lb
13 3.1175: Use a different or recycled raw material $19,814 $15,400 - - $19,814
-
gal
-
14 3.1191: Change procedures / equipment / operating conditions $13,077 $10,000 - - - $13,077
-
lb
15 3.5315: Lease / purchase baler; sell cardboard to recycler $3,451 - - - - $3,451
-
lb
TOTAL RECOMMENDED $226,653 $93,992 $15,322
300,409
kWh
$20,408
-
MMBtu
$19,814
-
gal
$171,109
-
lb
TOTAL IMPLEMENTED $25,845 $2,232 $12,392
242,965
kWh
$10,002
-
MMBtu
- $3,451
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs