ITAC Assessment: TN0526
ITAC logo
ITAC Assessment: TN0526
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Polyethylene plastic caps
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 102
Plant Area 92,000
ft2
Annual Production 2,000,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $455,709 10,126,612
kWh
Natural Gas $2,146 282
MMBtu
LPG $8,932 715
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,533 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,628

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $7,380 $4,530 $7,380
284,584
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $8,322 $2,040 $8,322
184,936
kWh
-
03 2.2511: Insulate bare equipment $8,137 $770 $8,137
180,832
kWh
-
04 2.7261: Install timers and/or thermostats $4,066 $3,700 $3,587
79,719
kWh
$479
-
MMBtu
05 2.7124: Make a practice of turning off lights when not needed $2,280 - $2,280
50,703
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,398 $1,250 $1,398
31,067
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $950 $1,656 $950
21,102
kWh
-
TOTAL RECOMMENDED $32,533 $13,946 $32,054
832,943
kWh
$479
-
MMBtu
TOTAL IMPLEMENTED $4,628 $2,906 $4,628
102,872
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs