ITAC Assessment: TN0524
ITAC logo
ITAC Assessment: TN0524
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Children's Apparel
NAICS
n/a
SIC 2361: Girls', Children's, and Infants' Dresses, Blouses, and Shirts
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 50,400
ft2
Annual Production 400,000
pieces
Production Hrs. Annual 2,938
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,743 1,268,464
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,888 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,214

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7144: Install spectral reflectors / delamp $3,212 $480 $3,212
48,066
kWh
02 2.6218: Turn off equipment when not in use $1,341 - $1,341
21,981
kWh
03 2.6212: Turn off equipment during breaks, reduce operating time $519 $570 $519
8,499
kWh
04 2.4221: Install compressor air intakes in coolest locations $375 $430 $375
6,155
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $286 $318 $286
4,689
kWh
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $155 $420 $155
4,396
kWh
TOTAL RECOMMENDED $5,888 $2,218 $5,888
93,786
kWh
TOTAL IMPLEMENTED $5,214 $1,228 $5,214
80,891
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs