ITAC Assessment: TN0520
ITAC logo
ITAC Assessment: TN0520
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Charcoal briquettes
NAICS
n/a
SIC 2861: Gum and Wood Chemicals
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 300,000
ft2
Annual Production 52,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,521 3,111,958
kWh
Natural Gas $149,449 26,694
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,473 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $5,885 $1,440 - $5,885
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $3,898 $769 - $3,898
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,019 $1,075 $2,019
36,049
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,182 - $1,182
21,102
kWh
-
05 2.7261: Install timers and/or thermostats $1,067 $640 $1,067
19,050
kWh
-
06 2.2511: Insulate bare equipment $274 $80 - $274
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $148 $95 $148
2,638
kWh
-
TOTAL RECOMMENDED $14,473 $4,099 $4,416
78,839
kWh
$10,057
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs