Assessment Year 1994
Principal Product Children's Apparel
NAICS
n/a
SIC 2361: Girls', Children's, and Infants' Dresses, Blouses, and Shirts
Sales Range $10
M
to 50
M
# of Employees 478
Plant Area 83,250
ft2
Annual Production 0
units
Production Hrs. Annual 6,552
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,622 2,487,397
kWh
Fuel Oil #2 $12,394 2,283
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,334 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,334

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.2136: Install / repair insulation on steam lines $2,997 $3,720 - $2,997
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,310 $810 $3,310
78,253
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $2,265 $480 $2,265
45,135
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $504 $400 $504
12,603
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $258 $600 $258
6,448
kWh
-
TOTAL RECOMMENDED $9,334 $6,010 $6,337
142,439
kWh
$2,997
-
MMBtu
TOTAL IMPLEMENTED $9,334 $6,010 $6,337
142,439
kWh
$2,997
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs