ITAC Assessment: TN0507
ITAC logo
ITAC Assessment: TN0507
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product paint
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $100
M
to 500
M
# of Employees 225
Plant Area 241,000
ft2
Annual Production 16,000
Tgal
Production Hrs. Annual 7,488
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $502,803 14,365,768
kWh
Natural Gas $243,040 63,958
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,551 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,298

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $5,985 $12,000 - $5,985
-
MMBtu
02 2.2163: Use minimum steam operating pressure $4,260 - - $4,260
-
MMBtu
03 2.7111: Reduce illumination to minimum necessary levels $10,416 $600 $10,416
273,447
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,703 $1,400 $1,703
48,652
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,652 $840 $1,652
47,186
kWh
-
06 2.4314: Use synthetic lubricant $1,293 - $1,293
36,928
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $646 $308 $646
18,464
kWh
-
08 2.2511: Insulate bare equipment $175 $330 - $175
-
MMBtu
09 2.2511: Insulate bare equipment $421 $481 $421
12,016
kWh
-
TOTAL RECOMMENDED $26,551 $15,959 $16,131
436,693
kWh
$10,420
-
MMBtu
TOTAL IMPLEMENTED $2,298 $1,148 $2,298
65,650
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs