| Assessment Year | 1994 |
|---|---|
| Principal Product | paint |
| NAICS |
n/a
|
| SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
| Sales Range | $100 M to 500M |
| # of Employees | 225 |
| Plant Area |
241,000
ft2
|
| Annual Production | 16,000
Tgal
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $502,803 | 14,365,768 |
kWh
|
$0.035 |
| Natural Gas | $243,040 | 63,958 |
MMBtu
|
$3.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $26,551 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,298 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7243: Improve air circulation with destratification fans / other methods | $5,985 | $12,000 | - |
$5,985
-
MMBtu
|
|
| 02 | 2.2163: Use minimum steam operating pressure | $4,260 | - | - |
$4,260
-
MMBtu
|
|
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $10,416 | $600 |
$10,416
273,447
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $1,703 | $1,400 |
$1,703
48,652
kWh
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,652 | $840 |
$1,652
47,186
kWh
|
- | |
| 06 | 2.4314: Use synthetic lubricant | $1,293 | - |
$1,293
36,928
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $646 | $308 |
$646
18,464
kWh
|
- | |
| 08 | 2.2511: Insulate bare equipment | $175 | $330 | - |
$175
-
MMBtu
|
|
| 09 | 2.2511: Insulate bare equipment | $421 | $481 |
$421
12,016
kWh
|
- | |
| TOTAL RECOMMENDED | $26,551 | $15,959 |
$16,131
436,693
kWh
|
$10,420
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $2,298 | $1,148 |
$2,298
65,650
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs