ITAC Assessment: TN0506
ITAC logo
ITAC Assessment: TN0506
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Denim Apparel
NAICS
n/a
SIC 2325: Men's and Boys' Separate Trousers and Slacks
Sales Range $5
M
to 10
M
# of Employees 137
Plant Area 29,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,912 597,597
kWh
Natural Gas $12,198 2,812
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,352 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7144: Install spectral reflectors / delamp $1,385 $3,990 n/a $1,385
19,930
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $905 $420 n/a $905
14,361
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $443 - n/a $443
7,034
kWh
-
04 2.6213: Turn off steam / hot water lines leading to space heating units $69 - n/a - $69
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $258 $720 n/a $258
4,103
kWh
-
06 2.2511: Insulate bare equipment $52 $104 n/a - $52
-
MMBtu
07 2.6212: Turn off equipment during breaks, reduce operating time $148 $280 n/a $148
2,345
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $92 $300 n/a $92
1,465
kWh
-
TOTAL RECOMMENDED $3,352 $5,814 $3,231
49,238
kWh
$121
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs