ITAC Assessment: TN0498
ITAC logo
ITAC Assessment: TN0498
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Honey buns, doughnuts, fried and bak
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 585
Plant Area 120,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,361 7,033,412
kWh
Natural Gas $232,795 61,660
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,629 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,896

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6121: Reduce hot water temperature to the minimum required $17,526 $20,380 - $17,526
-
MMBtu
02 2.2514: Cover open tanks $12,312 $7,480 - $12,312
-
MMBtu
03 2.1212: Operate boilers on high fire setting $9,029 $20,260 - $9,029
-
MMBtu
04 2.2163: Use minimum steam operating pressure $7,649 - - $7,649
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $4,032 $1,000 - $4,032
-
MMBtu
06 2.2511: Insulate bare equipment $2,696 $8,300 $2,696
67,409
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,219 $1,940 $1,219
30,481
kWh
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,055 - $1,055
26,377
kWh
-
09 2.4221: Install compressor air intakes in coolest locations $633 $95 $633
15,826
kWh
-
10 2.2511: Insulate bare equipment $478 $193 - $478
-
MMBtu
TOTAL RECOMMENDED $56,629 $59,648 $5,603
140,093
kWh
$51,026
-
MMBtu
TOTAL IMPLEMENTED $38,896 $39,388 $4,548
113,716
kWh
$34,348
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs