Assessment Year 2010
Principal Product Environmental Waste Disposal
NAICS 562211: Hazardous Waste Treatment and Disposal
SIC 4953: Refuse Systems
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 200,000
ft2
Annual Production 10,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,286,142 39,239,592
kWh
Natural Gas $2,553,072 287,456
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $280,848 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $279,493

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $138,978 $13,140 - $138,978
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $132,650 $40,600 $132,650
2,276,862
kWh
-
03 2.7224: Reduce space conditioning during non-working hours $7,865 $750 $7,865
135,000
kWh
-
04 2.6211: Conserve energy by efficient use of vending machines $612 $934 $612
10,512
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $389 $335 $389
6,680
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $254 $1,855 $254
4,368
kWh
-
07 2.7135: Install occupancy sensors $100 $120 $100
1,721
kWh
-
TOTAL RECOMMENDED $280,848 $57,734 $141,870
2,435,143
kWh
$138,978
-
MMBtu
TOTAL IMPLEMENTED $279,493 $54,490 $140,515
2,411,862
kWh
$138,978
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs