ITAC Assessment: AS0013
ITAC logo
ITAC Assessment: AS0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product MOBILE HOMES
NAICS
n/a
SIC 2451: Mobile Homes
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area
n/a
Annual Production 700
pieces
Production Hrs. Annual 2,783
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,842 342,028
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,149 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,867 $1,000 $14,867
145,955
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,173 $100 $1,173
11,430
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $367 $120 $367
3,517
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $318 $101 $318
3,224
kWh
05 2.7111: Reduce illumination to minimum necessary levels $1,424 - $1,424
14,068
kWh
TOTAL RECOMMENDED $18,149 $1,321 $18,149
178,194
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs