ITAC Assessment: TN0485
ITAC logo
ITAC Assessment: TN0485
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Engineered and roller chains
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area 190,000
ft2
Annual Production 11,000,000
lb
Production Hrs. Annual 7,344
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $469,559 8,738,277
kWh
Natural Gas $233,782 63,953
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,117 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $3,219 $3,110 - $3,219
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,103 $1,450 $8,103
150,059
kWh
-
03 2.6218: Turn off equipment when not in use $5,460 - $5,460
101,114
kWh
-
04 2.7261: Install timers and/or thermostats $3,403 $2,160 $3,403
63,013
kWh
-
05 2.2511: Insulate bare equipment $633 $627 - $633
-
MMBtu
06 2.7111: Reduce illumination to minimum necessary levels $299 $160 $299
4,982
kWh
-
TOTAL RECOMMENDED $21,117 $7,507 $17,265
319,168
kWh
$3,852
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs