ITAC Assessment: NC0131
ITAC logo
ITAC Assessment: NC0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product laminated furniture components
NAICS
n/a
SIC 2435: Hardwood Veneer and Plywood
Sales Range $5
M
to 10
M
# of Employees 140
Plant Area 150,000
ft2
Annual Production 2,500,000
thousand feet
Production Hrs. Annual 2,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,918 2,295,135
kWh
Electricity Demand $77,148 8,727
kW-mo/yr
Electricity Fees $766 -
Coal $5,000 2,069
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,239 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,498

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Coal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,652 - - $2,652
-
kW-mo/yr
- - - - - - -
02 2.4239: Eliminate or reduce compressed air usage $4,446 $9,100 $3,819
182,005
kWh
$2,775
-
kW-mo/yr
- $(-2,148.0)
-
MMBtu
- - - - -
03 2.8114: Change rate schedules or other changes in utility service $7,043 - - $47,912
-
kW-mo/yr
$(-40,869.0) - - - - - -
04 3.1191: Change procedures / equipment / operating conditions $846 - - - - $846
-
MMBtu
- - - - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $1,092 $5,200 - - - - $1,112
-
lb
- $480 - $(-500.0)
06 4.513: Re-arrange equipment layout to reduce labor costs $810 $2,000 - - - - - $810 - - -
07 4.211: Consider use / purchase of bulk materials where possible $7,350 - $(-277.0)
(-13,189)
kWh
$(-573.0)
-
kW-mo/yr
- - $200
-
lb
- - $8,000 -
TOTAL RECOMMENDED $24,239 $16,300 $3,542
168,816
kWh
$52,766
-
kW-mo/yr
$(-40,869.0) $(-1,302.0)
-
MMBtu
$1,312
-
lb
$810 $480 $8,000 $(-500.0)
TOTAL IMPLEMENTED $3,498 - - $2,652
-
kW-mo/yr
- $846
-
MMBtu
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Coal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs