ITAC Assessment: TN0478
ITAC logo
ITAC Assessment: TN0478
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Production and finishing of denim apparel
NAICS
n/a
SIC 2325: Men's and Boys' Separate Trousers and Slacks
Sales Range $10
M
to 50
M
# of Employees 345
Plant Area 73,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,540 2,682,591
kWh
Natural Gas $277,860 45,551
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,357 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7144: Install spectral reflectors / delamp $24,236 $23,278 n/a $24,236
397,421
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,737 $4,200 n/a $7,737
140,680
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,417 $1,972 n/a $3,417
62,134
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,483 - n/a $1,483
26,964
kWh
05 2.4221: Install compressor air intakes in coolest locations $742 $570 n/a $742
13,482
kWh
06 2.4314: Use synthetic lubricant $742 - n/a $742
13,482
kWh
TOTAL RECOMMENDED $38,357 $30,020 $38,357
654,163
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs