Assessment Year | 2005 |
---|---|
Principal Product | Bulk fluid milk products |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2020: |
Sales Range | $10 M to 50M |
# of Employees | 54 |
Plant Area |
57,169
ft2
|
Annual Production | 83,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $459,999 | 7,863,000 |
kWh
|
$0.059 |
Electricity Demand | $84,297 | 19,741 |
kW-mo/yr
|
$4.27 |
Electricity Fees | $11,907 | - |
|
- |
Natural Gas | $73,980 | 65,458 |
MMBtu
|
$1.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $67,663 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $52,266 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $13,769 | - |
$12,108
201,802
kWh
|
$1,661
-
kW-mo/yr
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,851 | - |
$3,129
52,153
kWh
|
$722
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $4,742 | $509 |
$4,178
69,640
kWh
|
$564
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,683 | $418 |
$2,359
39,312
kWh
|
$324
-
kW-mo/yr
|
- | - | |
05 | 2.1222: Install turbulators | $1,988 | $500 | - | - |
$1,988
-
MMBtu
|
- | |
06 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $30,000 | $16,000 | - | - | - | $30,000 | |
07 | 2.4314: Use synthetic lubricant | $1,072 | $1,000 |
$944
15,725
kWh
|
$128
-
kW-mo/yr
|
- | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,558 | $8,908 |
$8,409
140,151
kWh
|
$1,149
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $67,663 | $27,335 |
$31,127
518,783
kWh
|
$4,548
-
kW-mo/yr
|
$1,988
-
MMBtu
|
$30,000 | ||
TOTAL IMPLEMENTED | $52,266 | $17,927 |
$19,589
326,479
kWh
|
$2,677
-
kW-mo/yr
|
- | $30,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs