Assessment Year 2005
Principal Product Bulk fluid milk products
NAICS 311511: Fluid Milk Manufacturing
SIC 2020:
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 57,169
ft2
Annual Production 83,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $459,999 7,863,000
kWh
Electricity Demand $84,297 19,741
kW-mo/yr
Electricity Fees $11,907 -
Natural Gas $73,980 65,458
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,663 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,266

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $13,769 - $12,108
201,802
kWh
$1,661
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,851 - $3,129
52,153
kWh
$722
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $4,742 $509 $4,178
69,640
kWh
$564
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,683 $418 $2,359
39,312
kWh
$324
-
kW-mo/yr
- -
05 2.1222: Install turbulators $1,988 $500 - - $1,988
-
MMBtu
-
06 2.4222: Install adequate dryers on air lines to eliminate blowdown $30,000 $16,000 - - - $30,000
07 2.4314: Use synthetic lubricant $1,072 $1,000 $944
15,725
kWh
$128
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,558 $8,908 $8,409
140,151
kWh
$1,149
-
kW-mo/yr
- -
TOTAL RECOMMENDED $67,663 $27,335 $31,127
518,783
kWh
$4,548
-
kW-mo/yr
$1,988
-
MMBtu
$30,000
TOTAL IMPLEMENTED $52,266 $17,927 $19,589
326,479
kWh
$2,677
-
kW-mo/yr
- $30,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs