Assessment Year | 2005 |
---|---|
Principal Product | Filters |
NAICS | 333999: All Other Miscellaneous General Purpose Machinery Manufacturing |
SIC | 3569: General Industrial Machinery and Equipment, Not Elsewhere |
Sales Range | $10 M to 50M |
# of Employees | 96 |
Plant Area |
78,654
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 4,900
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $82,345 | 1,735,360 |
kWh
|
$0.047 |
Electricity Demand | $52,693 | 6,139 |
kW-mo/yr
|
$8.58 |
Electricity Fees | $201 | - |
|
- |
Natural Gas | $73,248 | 10,663 |
MMBtu
|
$6.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,240 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,810 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $220 | $300 |
$220
7,240
kWh
|
- | - | - | |
02 | 2.7231: Use radiant heater for spot heating | $18,100 | $10,800 |
$(-13,100.0)
(-432,000)
kWh
|
- |
$30,900
-
MMBtu
|
$300 | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,610 | $2,800 |
$2,610
85,700
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,610 | $6,510 |
$1,310
43,200
kWh
|
$1,300
-
kW-mo/yr
|
- | - | |
05 | 2.1113: Reduce combustion air flow to optimum | $1,820 | $60 | - | - |
$1,820
-
MMBtu
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,100 | - |
$1,100
36,200
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,780 | $5,000 |
$815
26,800
kWh
|
$965
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $28,240 | $25,470 |
$(-7,045.0)
(-232,860)
kWh
|
$2,265
-
kW-mo/yr
|
$32,720
-
MMBtu
|
$300 | ||
TOTAL IMPLEMENTED | $23,810 | $22,610 |
$(-9,655.0)
(-318,560)
kWh
|
$2,265
-
kW-mo/yr
|
$30,900
-
MMBtu
|
$300 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs