ITAC Assessment: GT0802
ITAC logo
ITAC Assessment: GT0802
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Filters
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 96
Plant Area 78,654
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,900
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,345 1,735,360
kWh
Electricity Demand $52,693 6,139
kW-mo/yr
Electricity Fees $201 -
Natural Gas $73,248 10,663
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,810

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $220 $300 $220
7,240
kWh
- - -
02 2.7231: Use radiant heater for spot heating $18,100 $10,800 $(-13,100.0)
(-432,000)
kWh
- $30,900
-
MMBtu
$300
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,610 $2,800 $2,610
85,700
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,610 $6,510 $1,310
43,200
kWh
$1,300
-
kW-mo/yr
- -
05 2.1113: Reduce combustion air flow to optimum $1,820 $60 - - $1,820
-
MMBtu
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,100 - $1,100
36,200
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,780 $5,000 $815
26,800
kWh
$965
-
kW-mo/yr
- -
TOTAL RECOMMENDED $28,240 $25,470 $(-7,045.0)
(-232,860)
kWh
$2,265
-
kW-mo/yr
$32,720
-
MMBtu
$300
TOTAL IMPLEMENTED $23,810 $22,610 $(-9,655.0)
(-318,560)
kWh
$2,265
-
kW-mo/yr
$30,900
-
MMBtu
$300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs