| Assessment Year | 1992 |
|---|---|
| Principal Product | CERAMIC CARRIERS ELEC. |
| NAICS |
n/a
|
| SIC | 3264: Porcelain Electrical Supplies |
| Sales Range | $10 M to 50M |
| # of Employees | 182 |
| Plant Area |
n/a
|
| Annual Production | 1,200,000
pieces
|
| Production Hrs. Annual | 4,576
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $769,574 | 15,738,570 |
kWh
|
$0.049 |
| Natural Gas | $82,995 | 20,200 |
MMBtu
|
$4.11 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $34,918 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $34,918 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7221: Lower temperature during the winter season and vice-versa | $12,781 | - |
$12,781
260,844
kWh
|
- | - | |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $8,617 | $2,080 |
$8,617
175,850
kWh
|
- | - | |
| 03 | 2.7123: Keep lamps and reflectors clean | $4,969 | $7,777 |
$4,600
93,787
kWh
|
- | $369 | |
| 04 | 2.7422: Plant trees or shrubs near windows to shield from sunlight | $3,447 | $13,480 |
$3,447
70,340
kWh
|
- | - | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $943 | $1,000 | - |
$943
-
MMBtu
|
- | |
| 06 | 2.2511: Insulate bare equipment | $1,120 | $488 |
$1,120
22,860
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,418 | $650 |
$2,068
42,204
kWh
|
- | $(-650.0) | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $977 | $220 |
$977
19,930
kWh
|
- | - | |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $416 | $540 |
$416
8,499
kWh
|
- | - | |
| 10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $230 | $90 |
$230
4,689
kWh
|
- | - | |
| TOTAL RECOMMENDED | $34,918 | $26,325 |
$34,256
699,003
kWh
|
$943
-
MMBtu
|
$(-281.0) | ||
| TOTAL IMPLEMENTED | $34,918 | $26,325 |
$34,256
699,003
kWh
|
$943
-
MMBtu
|
$(-281.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs