ITAC Assessment: TN0467
ITAC logo
ITAC Assessment: TN0467
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product CERAMIC CARRIERS ELEC.
NAICS
n/a
SIC 3264: Porcelain Electrical Supplies
Sales Range $10
M
to 50
M
# of Employees 182
Plant Area
n/a
Annual Production 1,200,000
pieces
Production Hrs. Annual 4,576
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $769,574 15,738,570
kWh
Natural Gas $82,995 20,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,918 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,918

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7221: Lower temperature during the winter season and vice-versa $12,781 - $12,781
260,844
kWh
- -
02 2.4239: Eliminate or reduce compressed air usage $8,617 $2,080 $8,617
175,850
kWh
- -
03 2.7123: Keep lamps and reflectors clean $4,969 $7,777 $4,600
93,787
kWh
- $369
04 2.7422: Plant trees or shrubs near windows to shield from sunlight $3,447 $13,480 $3,447
70,340
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $943 $1,000 - $943
-
MMBtu
-
06 2.2511: Insulate bare equipment $1,120 $488 $1,120
22,860
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,418 $650 $2,068
42,204
kWh
- $(-650.0)
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $977 $220 $977
19,930
kWh
- -
09 2.4221: Install compressor air intakes in coolest locations $416 $540 $416
8,499
kWh
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $230 $90 $230
4,689
kWh
- -
TOTAL RECOMMENDED $34,918 $26,325 $34,256
699,003
kWh
$943
-
MMBtu
$(-281.0)
TOTAL IMPLEMENTED $34,918 $26,325 $34,256
699,003
kWh
$943
-
MMBtu
$(-281.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs