ITAC Assessment: TN0451
ITAC logo
ITAC Assessment: TN0451
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product UPHOLSTERED FURNITURE
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $50
M
to 100
M
# of Employees 550
Plant Area
n/a
Annual Production 267,000
pieces
Production Hrs. Annual 3,825
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,979 1,993,259
kWh
Natural Gas $29,843 4,959
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,449 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,508 $17,934 $14,300
242,380
kWh
- $208
02 2.2437: Recover waste heat from equipment $1,656 $1,330 - $1,656
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,144 $1,475 $2,144
36,342
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,141 $440 $1,141
19,343
kWh
- -
TOTAL RECOMMENDED $19,449 $21,179 $17,585
298,065
kWh
$1,656
-
MMBtu
$208
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs