ITAC Assessment: TN0449
ITAC logo
ITAC Assessment: TN0449
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product CARPET YARN
NAICS
n/a
SIC 2282: Yarn Texturizing, Throwing, Twisting, and Winding Mills
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area
n/a
Annual Production 61,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,328,837 27,194,901
kWh
Fuel Oil #2 $344,670 62,807
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,875 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $105,875

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $51,669 $69,696 $47,363
966,589
kWh
- $4,306
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,239 $18,600 $13,716
279,894
kWh
- $(-1,477.0)
03 2.2414: Use waste heat from hot flue gases to preheat $8,635 $5,425 - $8,635
-
MMBtu
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $13,284 $2,175 $13,284
271,102
kWh
- -
05 2.2614: Use cooling tower or economizer to replace chiller cooling $8,588 $1,805 $8,588
175,264
kWh
- -
06 2.2437: Recover waste heat from equipment $8,056 $700 $8,056
164,420
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $3,404 $700 $3,404
69,461
kWh
- -
TOTAL RECOMMENDED $105,875 $99,101 $94,411
1,926,730
kWh
$8,635
-
MMBtu
$2,829
TOTAL IMPLEMENTED $105,875 $99,101 $94,411
1,926,730
kWh
$8,635
-
MMBtu
$2,829
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs