| Assessment Year | 1992 |
|---|---|
| Principal Product | CARPET YARN |
| NAICS |
n/a
|
| SIC | 2282: Yarn Texturizing, Throwing, Twisting, and Winding Mills |
| Sales Range | $100 M to 500M |
| # of Employees | 350 |
| Plant Area |
n/a
|
| Annual Production | 61,000,000
lb
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,328,837 | 27,194,901 |
kWh
|
$0.049 |
| Fuel Oil #2 | $344,670 | 62,807 |
MMBtu
|
$5.49 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $105,875 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $105,875 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $51,669 | $69,696 |
$47,363
966,589
kWh
|
- | $4,306 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,239 | $18,600 |
$13,716
279,894
kWh
|
- | $(-1,477.0) | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $8,635 | $5,425 | - |
$8,635
-
MMBtu
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $13,284 | $2,175 |
$13,284
271,102
kWh
|
- | - | |
| 05 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $8,588 | $1,805 |
$8,588
175,264
kWh
|
- | - | |
| 06 | 2.2437: Recover waste heat from equipment | $8,056 | $700 |
$8,056
164,420
kWh
|
- | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $3,404 | $700 |
$3,404
69,461
kWh
|
- | - | |
| TOTAL RECOMMENDED | $105,875 | $99,101 |
$94,411
1,926,730
kWh
|
$8,635
-
MMBtu
|
$2,829 | ||
| TOTAL IMPLEMENTED | $105,875 | $99,101 |
$94,411
1,926,730
kWh
|
$8,635
-
MMBtu
|
$2,829 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs