ITAC Assessment: OR0150
ITAC logo
ITAC Assessment: OR0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SOFTWOOD PLYWOOD
NAICS
n/a
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 268
Plant Area
n/a
Annual Production 139,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $723,621 18,207,796
kWh
Natural Gas $165,973 55,844
MMBtu
LPG $56,533 11,531
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,098 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,098

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $9,691 $500 - $9,029
-
MMBtu
$662
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,147 $15,000 $19,147
422,626
kWh
- -
03 2.4133: Use most efficient type of electric motors $1,838 $3,527 $1,838
46,600
kWh
- -
04 2.3212: Optimize plant power factor $10,422 $22,125 $10,422
-
kWh
- -
TOTAL RECOMMENDED $41,098 $41,152 $31,407
469,226
kWh
$9,029
-
MMBtu
$662
-
MMBtu
TOTAL IMPLEMENTED $41,098 $41,152 $31,407
469,226
kWh
$9,029
-
MMBtu
$662
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs