ITAC Assessment: TN0446
ITAC logo
ITAC Assessment: TN0446
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product DENIM PANTS
NAICS
n/a
SIC 2325: Men's and Boys' Separate Trousers and Slacks
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area
n/a
Annual Production 4,800,000
pieces
Production Hrs. Annual 2,880
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,870 815,358
kWh
LPG $17,394 1,858
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,165 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,165

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $5,675 $2,700 $5,675
84,701
kWh
- -
02 2.2437: Recover waste heat from equipment $1,089 $1,590 - $1,089
-
MMBtu
-
03 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $507 - - $507
-
MMBtu
-
04 2.2136: Install / repair insulation on steam lines $488 $165 - $488
-
MMBtu
-
05 2.7123: Keep lamps and reflectors clean $1,068 - $1,021
15,240
kWh
- $47
06 2.2511: Insulate bare equipment $338 $859 - $338
-
MMBtu
-
TOTAL RECOMMENDED $9,165 $5,314 $6,696
99,941
kWh
$2,422
-
MMBtu
$47
TOTAL IMPLEMENTED $9,165 $5,314 $6,696
99,941
kWh
$2,422
-
MMBtu
$47
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs