Assessment Year | 2001 |
---|---|
Principal Product | Fabricated Metal Products |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
48,000
ft2
|
Annual Production | 2,500,000
pieces
|
Production Hrs. Annual | 5,100
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $49,851 | 1,451,301 |
kWh
|
$0.034 |
Electricity Demand | $49,287 | 3,890 |
kW-mo/yr
|
$12.67 |
Electricity Fees | $6,432 | - |
|
- |
Natural Gas | $7,940 | 1,140 |
MMBtu
|
$6.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $159,623 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $143,239 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,132 | $1,600 |
$5,287
135,565
kWh
|
$3,845
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,072 | $55,760 |
$8,147
208,895
kWh
|
$5,925
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $623 | $1,370 |
$195
4,993
kWh
|
$86
-
kW-mo/yr
|
$241 | $101 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,689 | $8,460 |
$925
23,722
kWh
|
$732
-
kW-mo/yr
|
$32 | - | |
05 | 2.4133: Use most efficient type of electric motors | $6,107 | $2,401 |
$360
9,222
kWh
|
$5,747
-
kW-mo/yr
|
- | - | |
06 | 4.426: Modify workload | $128,000 | $55,800 | - | - | $128,000 | - | |
TOTAL RECOMMENDED | $159,623 | $125,391 |
$14,914
382,397
kWh
|
$16,335
-
kW-mo/yr
|
$128,273 | $101 | ||
TOTAL IMPLEMENTED | $143,239 | $59,801 |
$5,647
144,787
kWh
|
$9,592
-
kW-mo/yr
|
$128,000 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs