| Assessment Year | 1991 |
|---|---|
| Principal Product | HARDWOOD PARTS |
| NAICS |
n/a
|
| SIC | 3995: Burial Caskets |
| Sales Range | $5 M to 10M |
| # of Employees | 200 |
| Plant Area |
n/a
|
| Annual Production | 1,300
thousand feet
|
| Production Hrs. Annual | 2,250
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $222,550 | 3,220,985 |
kWh
|
$0.069 |
| Natural Gas | $37,877 | 8,761 |
MMBtu
|
$4.32 |
| Fuel Oil #2 | $24,840 | 5,040 |
MMBtu
|
$4.93 |
| Wood | $9,000 | 185,760 |
MMBtu
|
$0.048 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $58,845 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $58,845 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2136: Install / repair insulation on steam lines | $26,217 | $1,204 | - |
$26,217
-
MMBtu
|
- | |
| 02 | 2.2135: Repair and eliminate steam leaks | $9,331 | $500 | - |
$9,331
-
MMBtu
|
- | |
| 03 | 2.6231: Utilize controls to operate equipment only when needed | $6,936 | $12,057 |
$6,936
100,528
kWh
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,440 | - |
$5,440
78,839
kWh
|
- | - | |
| 05 | 2.7123: Keep lamps and reflectors clean | $3,626 | - |
$3,458
50,117
kWh
|
- | $168 | |
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $6,646 | $19,100 |
$6,646
12,896
kWh
|
- | - | |
| 07 | 2.7212: Install or upgrade insulation on hvac distribution systems | $487 | - |
$455
6,741
kWh
|
$32
-
MMBtu
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $162 | $392 |
$162
2,345
kWh
|
- | - | |
| TOTAL RECOMMENDED | $58,845 | $33,253 |
$23,097
251,466
kWh
|
$35,580
-
MMBtu
|
$168 | ||
| TOTAL IMPLEMENTED | $58,845 | $33,253 |
$23,097
251,466
kWh
|
$35,580
-
MMBtu
|
$168 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs