ITAC Assessment: TN0436
ITAC logo
ITAC Assessment: TN0436
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product HARDWOOD PARTS
NAICS
n/a
SIC 3995: Burial Caskets
Sales Range $5
M
to 10
M
# of Employees 200
Plant Area
n/a
Annual Production 1,300
thousand feet
Production Hrs. Annual 2,250
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $222,550 3,220,985
kWh
Natural Gas $37,877 8,761
MMBtu
Fuel Oil #2 $24,840 5,040
MMBtu
Wood $9,000 185,760
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,845 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,845

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2136: Install / repair insulation on steam lines $26,217 $1,204 - $26,217
-
MMBtu
-
02 2.2135: Repair and eliminate steam leaks $9,331 $500 - $9,331
-
MMBtu
-
03 2.6231: Utilize controls to operate equipment only when needed $6,936 $12,057 $6,936
100,528
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,440 - $5,440
78,839
kWh
- -
05 2.7123: Keep lamps and reflectors clean $3,626 - $3,458
50,117
kWh
- $168
06 2.6212: Turn off equipment during breaks, reduce operating time $6,646 $19,100 $6,646
12,896
kWh
- -
07 2.7212: Install or upgrade insulation on hvac distribution systems $487 - $455
6,741
kWh
$32
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $162 $392 $162
2,345
kWh
- -
TOTAL RECOMMENDED $58,845 $33,253 $23,097
251,466
kWh
$35,580
-
MMBtu
$168
TOTAL IMPLEMENTED $58,845 $33,253 $23,097
251,466
kWh
$35,580
-
MMBtu
$168
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs